San Francisco International Airport

Boarding Areas A & G

San Francisco, CaliforniaBoarding Areas A & G, located at the San Francisco International Airport in Burlingame, California, are two of 34 on-going expansion projects in the SFIA master plan

Boarding Areas A & G, located at the San Francisco International Airport in Burlingame, California, are two of 34 on-going expansion projects in the SFIA master plan. Provided inspection and material testing services, reinforced concrete, structural steel, structural masonry. These three story buildings, valued at $74,000,000 and $73,000,000 respectively, were constructed of structural steel using modern “Special Moment Resisting Frame” (SMRF) technology with the exterior building skin comprised of manufactured metal panels, architectural louvers and an aluminum curtain wall system.

yyy


California Environmental Protection AgencyThe California Environmental Protection Agency Headquarters is located at 5th and I streets in downtown SacramentoHeadquarters Building

Sacramento, California

The California Environmental Protection Agency Headquarters is located at 5th and I streets in downtown Sacramento, California. This twenty-five story, 950,000 square foot high-rise structure is built on piles with poured-in-place concrete pile caps and grade beams. This structure utilizes a combination of structural steel-moment resistant frame/braced frame, metal floor decking, poured-in-place concrete slabs and spray applied fireproofing. The exterior cladding consists of precast panels with a granite facade.

yyy


Courtyard by MarriottThe Courtyard by Marriott-San Francisco is a eighteen -story, post-tensioned concrete frame structure located at Second Street in San Francisco. Our scope of services included the evaluation of post-tension decks for the detection of elements embedded in concrete

San Francisco, California

The Courtyard by Marriott-San Francisco is a eighteen -story, post-tensioned concrete frame structure located at Second Street in San Francisco. Our scope of services included the evaluation of post-tension decks for the detection of elements embedded in concrete.


Marriott Timber Lodge at Lake Tahoe

South Lake Tahoe, CaliforniaThe Marriott Timber Lodge at South Lake Tahoe is part of the on-going redevelopment of the Park Avenue Area at South Lake Tahoe, California. This project consisted of construction of a 103,000 square foot, subterranean parking structure, 132 rooms and ground floor retail. The structure consisted of cast-in-place concrete, post-tensioned concrete, structural masonry, structural steel, soils and fireproofing

The Marriott Timber Lodge at South Lake Tahoe is part of the on-going redevelopment of the Park Avenue Area at South Lake Tahoe, California. This project consisted of construction of a 103,000 square foot, subterranean parking structure, 132 rooms and ground floor retail. The structure consisted of cast-in-place concrete, post-tensioned concrete, structural masonry, structural steel, soils and fireproofing.

yyy


John E Moss Federal Building

Sacramento, CaliforniaEight (8) story high-rise. Project scope included radiography of concrete roof deck for the evaluation of structural reinforcement to allow for the anchorage of the roof davit supports, roof drains, installation of a new decorative canopy, and the installation of a new vestibule

Eight (8) story high-rise. Project scope included radiography of concrete roof deck for the evaluation of structural reinforcement to allow for the anchorage of the roof davit supports, roof drains, installation of a new decorative canopy, and the installation of a new vestibule.


yyy

One Capitol Mall

One Capitol Mall, Capitol Mall and Front StreetConstruction of an 8-story, 240,000 sf office building located on the waterfront in Old Sacramento

Project Description: Construction of an 8-story, 240,000 sf office building located on the waterfront in Old Sacramento.

Total Project Cost: $26 million

Date of Completion: 1992


State of California East End Project

East End ProjectConstruction of 1,470,000 gross sf of office and

15th and Capitol Mall

Project Description: Construction of 1,470,000 gross sf of office and
retail. Approx. $4.2 million was allocated for housing, preservation,
lighting and park enhancements.

Total Project Cost: $392 million

Date of Completion: 2003


CalPERS

SacramentoProject Description: The California Public Employees Retirement System is building a 550,000 sf office complex along Q Street between 3rd and 5th to expand their existing headquarters directly north along P Street. The project will also include a 1,000 space underground parking garage, approximately 20,000 sf of commercial space for retail, and a child care center open to the public. In addition approximately 180 residential units will be developed along the project frontage on R Street and additional parcels between 5th and 7th on R Street

Project Description: The California Public Employees Retirement System is building a 550,000 sf office complex along Q Street between 3rd and 5th to expand their existing headquarters directly north along P Street. The project will also include a 1,000 space underground parking garage, approximately 20,000 sf of commercial space for retail, and a child care center open to the public. In addition approximately 180 residential units will be developed along the project frontage on R Street and additional parcels between 5th and 7th on R Street.

Total Project Cost: Estimated at $220 million

Date of Completion: Office, Parking and Commercial Components
– End of 2004

Residential Component – End of 2006


800 J Street Lofts

Sacramento, California

The 800 J Lofts, commonly known as “9th and J,” features a 7-story mixed-use development with ground floor retail and rental apartment units on several parcels fronting J Street in Downtown. Parking includes over 150 spaces below ground in an existing basement and 75 stalls above ground in the back of the project facing the alley. Provided X-ray and Concrete coring for all ground floor retail spaces.